Unrestricted Report

ITEM NO:  08

Application No.

21/01090/FUL

Ward:

Wildridings And Central

Date Registered:

16 November 2021

Target Decision Date:

11 January 2022

Site Address:

Abbey House Grenville Place Bracknell Berkshire 

Proposal:

Erection of an additional third floor storey to the existing building together with extension at second floor level to create a further six residential units (4 x 2 bedroom and 2 x 1 bedroom) and ancillary development.

Applicant:

Equinox Living

Agent:

Miss Tasha Bullen

Case Officer:

Katie Andrews, 01344 352000

Development.control@bracknell-forest.gov.uk

 

Site Location Plan 

 

 

(for identification purposes only, not to scale)


OFFICER REPORT

 

1.            SUMMARY

1.1     This application is for an extension to provide an additional floor to the existing building, together with an extension at the second floor, to create a further six residential units. The building below is in an existing residential use, providing 40 flats, which was permitted  under prior approval consent 17/00562/PAC. The application is considered to be acceptable in terms of heritage, impact upon amenities, parking and design and appearance.

 

RECOMMENDATION

That the Assistant Director: Planning grant planning permission subject to the conditions in Section 11 of this report and subject to a S106 to secure SPA mitigation.

 

2. REASONS FOR REPORTING APPLICATION TO COMMITTEE

 

2.1     The application is before the committee due to the number of objections received. 

 

3. PLANNING STATUS AND SITE DESCRIPTION

 

PLANNING STATUS

Within Town Centre

Within Settlement Boundary

Within Setting of Listed Buildings

Within 5km of SPA

 

3.1 The application site relates to a block of 40 flats located within Bracknell Town Centre.

3.2  The site is surrounded by 3 x Grade II Listed Buildings; Whynscar House and The Old Manor Public House to the north and Holy Trinity Church to the south. The Ringway lies to the west and Church Road to the east. Bracknell and Wokingham College lies to the east.

3.3 The buildings surrounding the site are generally in office use with some residential, commercial and ecclesiastical uses.

 

4.       RELEVANT SITE HISTORY

 

17/00562/PAC Application for Prior Approval for the change of use of from offices (Class B1) to 40 no. residential units (Class C3) comprising 34no. 1 bedroom, 5 no. 2 bedroom and 1no. studio apartments. Granted 19.07.2017

 

17/00683/FUL Installation of replacement windows.  Approved 17.08.2017

17/00707/FUL Proposed external alterations to building including cladding, painted brickwork and changes to windows.  Approved 20.09.2017

17/00816/FUL Provision of 6 additional car parking spaces. Approved 20.09.2017

17/01374/NMA Non Material Amendment to alter entrance layout for planning permission Approved 01.02.2018

 

 

5.       THE PROPOSAL

 

5.1 Planning permission is sought for an additional floor to be erected above the current residential building, and an extension at the second floor, to create an additional 4 x 2 bed flats and 2 x 1 bed flats (6 in total).

 

5.2 The existing building is varied in its height but is generally between 11m in height at its lowest point and 16.5m in height at its highest point. This lower height would increase to around 14m, with the highest point remaining the same under this proposal. The second floor extension will create a new floor above an existing bin store element to the rear of the building.

 

5.3 The existing building is constructed with red brick. The proposed roof extension would be constructed using a grey metallic standing seam structure. The extension above the bin store would be constructed from red brick.

 

5.4 The carpark has 37 parking spaces in total. The application site is currently served by 29 parking spaces and does not propose any changes to the carpark or land surrounding the building. The remaining 8 parking spaces within the carpark are used by the Holy Trinity Church.

 

6.       REPRESENTATIONS RECEIVED

 

Bracknell Town Council

6.1  Recommend refusal

1) Overdevelopment of this building taking it completely out of character with the old heritage buildings surrounding it, The Holy Trinity Church on one side and The Old Manor on the other.

2) Increased traffic congestion there is already proof of parking issues the spaces reserved for the Holy Trinity Church are regularly used for considerable lengths of time by visitors or trades persons to Abbey House adding more residential units will just exacerbate this problem. Referring to Bracknell Town Neighbourhood Plan Policy HO4 and Bracknell Forest Parking Standards are already not being met

The Bracknell Forest Society

6.2 Raises concern regarding the following matters:

1) Existing car parking problems

2) No additional parking provision

3) Parking demand

4) Inadequacy of parking standards

 

Other representations:

 

6.3  7 objections have been received on the following grounds:

 

-       Parking for Holy Trinity Church currently used by Abbey House flat owners, their visitors and tradespeople. This will increase after extension.

-       Parking unavailable for Holy Trinity Church use.

-       Building work and disruption to Holy Trinity Church during the construction.

-       Shortfall of parking across the development.

-       Highway safety issue with vans parking across the access.

-       Affects the amenity of The Church.

 

7.       SUMMARY OF CONSULTATION RESPONSES

 

SPA

7.1 Seeks further contributions to mitigate the impact upon the SPA. This should be secured by S106.

 

Highways

7.2 No objections subject to conditions.

Waste

7.3 No additional bins are required or changes to the current bin store to accommodate the additional 6 units.

 

Heritage Consultant

7.4 No objections subject to conditions.

Environmental Health

7.5 Recommend conditions to secure a noise assessment and mitigation to minimise noise from external noise sources and hours of work to protect existing residents.

Biodiversity

7.6  Due to the flat roof design of this building and its highly urban location there are no notable ecological issues with the application. There are some surrounding trees that provide a green thread that runs north to south along Church Road which is identified in the Green Infrastructure study for its landscape and amenity function so it should be conserved if possible (Officer note: there are no changes proposed to the area surrounding the building/trees).

 

8. MAIN POLICIES AND OTHER DOCUMENTS RELEVANT TO THE DECISION

 

 

Development Plan Policy

NPPF

General policies

CS1 & CS2 of CSDPD

Consistent

Town Centre

CS3 of CSDPD, E1 of BFBLP, SALP Policy SA11

Consistent

Heritage

CSDPD Policies CS1 & CS7

 

Consistent

Design

CS7 of CSDPD, EN1 and EN20 of BFBLP

Consistent

Parking

CS23 of CSDPD, M4 and M9 of BFBLP

Consistent

 

Highway Safety

CS23 and CS24 of CSDPD, M9 of BFBLP

Consistent

Cycling and pedestrians

CS23 and CS24 of CSDPD, M6 of the BFBLP, TC1 of the BNP

Consistent

Residential Amenity

EN20 and EN25 of BFBLP, ENV2 of BNP

Consistent

 

Housing

CS16, CS17 of CSDPD, H5 of BFBLP, SA6 of SALP.

Consistent

Accessibility

CS7 of CSDPD, EN22 of BFBLP

Consistent

Biodiversity

CS1(vii) and CS7 (iii) of CSDPD

Consistent

Sustainability

CS10 and CS12 of CSDPD

Consistent

Noise

EN25 of BFBLP

Consistent

SPA

SEP  NRM6, CS14 of CSDPD  and EN3 of BFBLP

Consistent

Supplementary Planning Documents (SPD)

Design SPD

Streetscene SPD

Parking Standards SPD

Thames Basin Heaths Special Protection Area SPD

Planning Obligations SPD

Other publications

National Planning Policy Framework (NPPF) and National Planning Policy Guidance (NPPG)

 

In addition, the Bracknell Town Neighbourhood Plan came into force  on 27 October 2021. The relevant policies from this which are considered consistent with the NPPF are:

Policy HE2 Protection of the Settings of Heritage Assets

Policy HO4 Managing the Streetscape

Policy HO6 Buildings: Energy Efficiency and Generation

Policy HO8 Buildings: Good Quality Design

Policy EC6 Broadband

9. PLANNING CONSIDERATIONS

9.1         The key issues for consideration are:

i  Principle of development

ii  Heritage

iii  Design and Character of the area

iv  Impact upon residential amenities

v  Highway Implications

vi  Thames Basin Heaths Special Protection Areas

vii  Sustainability

viii  CIL

 

i.              Principle of development

9.1 The application site is in a residential use following the conversion of the previous office to residential use under prior approval consent 17/00562/PAC.

9.2 Core Strategy Policy CS2 sets out a number of locational principles for new development within Bracknell Forest, including a sequence of allocation, directing development to the Town Centre first, followed by previously developed and other land within defined settlements. The site lies in the Town Centre, within a defined settlement, and is previously developed land. Policy CS2 states that development will be permitted within defined settlements and on allocated sites. The proposed development is therefore in accordance with Policy CS2.

9.3 The site is situated within the town centre boundary where policies, including BFBLP Policy E1, SALP Policy SA11, CSDPD Policy CS3 allow residential development. These policies are consistent with the NPPF. The principle of the development is therefore considered acceptable. 

ii.            Heritage

 

Listed Buildings and their settings

9.4 Surrounding the site are 3 x Grade II Listed Buildings. The Old Manor House Public House, a mid 15th century building which has been altered in the 16th, 17th, 19th and 20th centuries. Whynscar House, now used as offices is a 17th century building, extended and refaced in the 18th century and altered and extended in the late 20th century. Holy Trinity Church, the lychgate and section of the boundary wall are all Grade II Listed.

Planning (Listed Buildings and Conservation Areas) Act 1990

9.5 Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (‘the Act’) states that:

‘in considering whether to grant planning permission for development which affects a listed building or its setting, the local planning authority, or, as the case may be, the Secretary of State shall have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses.’

9.6 Holy Trinity Church is an attractive and well-preserved parish church of 1851, built in anticipation of Bracknell's rapid growth in the mid-19th century.  It contains a suite of good early 20th century fittings, as well as a number of stained-glass windows by leading designers.

9.7 Whynscar House is built of part timber frame encased in brick, and part brick in Flemish bond with some dark headers. It has an old tile gabled roof. The building is part 2 storeys and an attic.

9.8 The Old Manor House is a former hall house, now restaurant and public house. Built in the early to mid-15th century and altered in the 16th, 17th, 19th and 20th centuries.  There are later extensions on the north elevation. The building is part two/three storeys, with an attic.   

9.9 A number of visualisations have been supplied with the application to show the proposals in relation to the existing building. The existing building is a red-brick building built in a form of hard engineering brick. The proposed extensions would use a grey metallic standing seam structure which would, visually, break-up the mass of the building and aesthetically enhance a building which appears ‘unfinished’. The metal stand-seam design together with its ‘set back’ from the parapet edge, differentiates between the main building and the new extension and gives a more completed appearance to the top floor.

9.10 The proposed extension above the bin store has been designed in a form which fits in with the existing overall design for the building and is proposed to be constructed in red brick. 

9.11 Due to the design and appearance of the proposed roof storey extension and bin store extension the proposals are considered to have a negligible effect on the settings of the Grade II Listed Holy Trinity Church, its associated church yard walls, the Grade II Whynscar House and the Grade II Old Manor House. In the absence of the development causing any material harm to the significance of adjacent heritage assets, approval of the development is considered to be consistent with the statutory s66 duty in relation to the desirability of preserving the setting of listed buildings.

iii Design and Character of the area

 

9.12 Policy CS7 deals with the design of new development and expects proposals to build on the urban character, respecting patterns of development and the historic environment. BFBLP Policy EN20 (proviso i) requires development to be in sympathy with the character and appearance of the local environment and appropriate in scale, mass, design, materials, layout and siting, both in itself and in relation to adjoining buildings, spaces and views. These policies are consistent with Chapter 12 of the NPPF and are therefore considered to have significant weight.

9.13 The site is located in the Town Centre and within the immediate setting of the application site there are the three listed buildings highlighted under the Heritage section of the report (ii). The site is also located close to Bracknell and Wokingham College to the east, which is an eight storey building, a five storey car park to the west, a seven storey office building to the south, and a five storey residential building to the north west. The site is also dominated by an extensive area of hard landscaped carparking, as well as main roads surrounding the site.

North (Front Elevation)

South (Rear Elevation)

9.14 The proposal results in the extension of the existing building, with a single storey extension on the roof of Abbey House, which is set back from the front and rear façades of the existing building, providing external terraces for the new flats. A first floor extension is also proposed above the existing bin store.

9.15 The main single storey extension, to the roof of Abbey House, is constructed with metal cladding, with fenestration following the existing building. The materials provide a contrast to the existing building and due to its set back position, provides a subordinate relationship with the existing building and a sympathetic addition.

9.16 The extension above the bin store provides a single storey element in matching red brick with the same proportions as the existing building.

9.17 The overall scale, mass and design of the extensions are considered to be sympathetic to the existing building and overall character of the surrounding street scene. The application is therefore considered to accord with  CSDPD Policy CS7, CS9, BFBLP 'Saved' Policies EN8, and EN20, the Design SPD, and the NPPF.

 

iv. Impact upon residential amenities

 

9.18 Policy EN20 criterion (g) of the BFBLP stipulates that in considering proposals, the amenity of surrounding properties should not be adversely affected. The amenities of existing residents and future occupiers is therefore a material consideration in considering an application.

9.19 The site is surrounded by commercial and residential properties to the east, north and west, and the Holy Trinity Church to the south. The proposed development would not be located near to any residential properties, with the closest properties Wynscar House and Glaisher House directly opposite, being in office use and set over 12m from the development. The second floor extension over the bin store would be over 27m from Holy Trinity Church.

9.20 For future residents of the development, good lighting is provided and south facing private amenity space has been provided in the form of terraces.

9.21 The application has been supported by a Daylight, Sunlight and Overshadowing Assessment.  This assesses both the daylight and sunlight impact to the surrounding developments, as well as analysing the daylight and sunlight levels within the residential spaces of the proposed scheme. This assessment identifies that the proposed development will meet the requirements of the policies in relation to daylight and sunlight for future residents and surrounding properties.

9.22 Accordingly, the proposal is considered to preserve the amenities of both existing and future occupiers and comply with Policy EN20 (g) of the BFBLP.

v. Highway Implications

 

9.23 Abbey House is located on the eastern side of The Ring, located within Bracknell Town centre. The site is within 650m (circa 10-minute walk) of Bracknell town centre, Bus Station and Train station which both provide frequent links to the wider area including London Waterloo and Reading.

 

9.24 A Prior Approval application, 17/00562/PAC, was granted approval in July 2017 for the change of use of the 1,830sqm office building to provide 40 residential units, comprising 1 x studio, 34 x one-bedroom and 5 x two-bedroom units. The application involved the removal of the mini roundabout within the car park and provided a total of 24 car parking spaces to serve the 40 units which equates to a ratio of 0.6 spaces per unit.

 

9.25 A full application,17/00816/FULL, was granted approval in September 2017 for the provision of 6 additional car parking spaces. This increased the car park size from 24 car parking spaces to 30 car parking spaces, although only 29 spaces were implemented.

 

Access Arrangements

 

9.26 The pedestrian infrastructure surrounding Abbey House is extensive and of good quality. All roads surrounding the site are provided with footways to assist with safe pedestrian movement to the town centre, train and bus station as well as to the bus stop directly to the north of the site. Immediately adjacent to the site, The Ring benefits from 2m plus wide continuous footways on both sides of the carriageway. To the north of the site's access, a staggered signalised pedestrian crossing is provided across The Ring, equipped with dropped kerbs, tactile paving and guard rail, facilitating safe pedestrian movement to local bus stops and amenities within Bracknell town centre. Access for vehicles is taken from The Ring, via a left-in and left-out arrangement which serves the site and Holy Trinity Church. The applicant has confirmed that these access arrangements will be retained.

 

9.27 With regards to the visibility splays the access can achieve vehicle visibility splays of 2.4m x 43m to the right in accordance with Manual for Streets. Pedestrian visibility splays in excess of 2m can be achieved at the existing access to ensure drivers can see and be seen by pedestrians and cyclists approaching from either side.

 

9.28 None of the proposals will affect these existing arrangements.

 

Parking Provision/requirement

 

9.29 It should be noted that all the adopted roads within the vicinity of the site have double yellow line parking restrictions to prevent indiscriminate parking. Some spaces within the town centre are available but are restricted to a maximum stay of 30 minutes to 1-hour with no return within 30 minutes / 1-hour.

 

9.30 Under approved planning application 17/00816/FUL it was agreed that 4 spaces and a layby would be provided for the church and 30 spaces would be provided for Abbey House.

 

9.31 The Transport Note, submitted by Syntegra Consulting, dated February 2022  confirms that Abbey House is fully occupied, and the car park is solely for the residents at Abbey House and the church.

 

9.32 The 8 existing car parking spaces will be retained for the church.

 

9.33 Abbey House is provided with 29 spaces and permits are issued to the residents on a 12-month lease. As there are 40 apartments, this provides a current parking ratio of 0.725 spaces per unit.

 

9.34 The applicant now seeks to create an extra floor to provide:

 

4 x 2 bedroom units

2 x 1 bedroom units

 

9.35 To comply with Table 5 of the Local Authority's current Parking Standards SPD (2016) the development will require an additional 6 parking spaces (0.9 spaces per dwelling as site falls within Bracknell Town Centre).

 

9.36 The Transport Note confirms that the existing parking arrangements will be retained on site and no additional parking will be provided to accommodate the additional residential accommodation. This will therefore reduce the parking ratio from 0.725 to 0.63 on the basis that 29 car parking spaces will be retained for the residential element.

 

9.37 Following the Highway Authority's original comments, the applicant has now submitted 2 independent parking surveys of the existing car park to demonstrate whether there is capacity within the existing car park to accommodate the predicted increase.

 

9.38  The parking surveys were undertaken by Auto Survey Ltd on Wednesday 26th January and Thursday 27th January 2022 between 00:30 and 05:30.

 

9.39  Table 2 below, demonstrates that of the 29 car parking spaces available at Abbey House, 21 and 22 spaces were occupied on each of the night-time period surveys, leading to 8 and 7 available spaces. This equates to a parking stress of 72% and 74%.

 

 

The above parking surveys were conducted on the 26th January 2022 at 01:00 and 27th January 2022 at 03:30.

 

9.40  From this evidence, it is considered that there is potentially sufficient parking available to accommodate the proposed development during the times when it is most needed. The Highway Authority disagrees with 5.1.4. of the Transport Note and would request that one designated space isn't allocated to each new flat. Instead, the spaces should remain communal, and a parking permit only issued if it is required. The Highway Authority would request that a car parking management plan is submitted.

 

Vehicle Movements

 

9.41 . It was said under the previous permissions that 40 apartments could generate circa 80 two-way trips and the previous office would have generated around 180 two-way trips. With the addition of 6 extra apartments the development will likely still produce significantly less vehicle movements per day compared to the previous office use.

 

9.42  The proposal is therefore not considered to have a detrimental impact on the local highway network in terms of capacity.

 

Cycle Provision

 

9.43  To comply with the Local Authority's current cycle parking standards, 10 additional secure, covered cycle spaces will be required (1 cycle space per bedroom).

 

9.44  The applicant will be required to submit this information as well as confirm the route from the store to the adopted highway to ensure a bicycle can be safely wheeled to and from the store.

 

9.45  Given the new accommodation will likely accommodate families with children, the type of facility should also be able to accommodate children's bicycles and those who are less able (i.e. vertical cycle parking is not suitable).

 

9.46  The Highway Authority has no objection to the proposed development subject to conditions and an informative being appended to the planning permission, should it be granted.

vi.Thames Basin Heaths Special Protection Areas

 

9.47 The Council, in consultation with Natural England, has formed the view that any net increase in residential development between 400m and 5km straight-line distance from the Thames Basin Heath Special Protection Area (TBH SPA) along with any larger developments comprising over 50 net new dwellings within the 5 - 7km zone is likely to have a significant effect on the integrity of the TBH SPA, either alone or in-combination with other plans or projects.

 

9.48  This site is located within the 400m – 5km Thames Basin Heaths Special Protection Area (TBH SPA) buffer zone and therefore is likely to result in an adverse effect on the SPA, unless it is carried out together with appropriate avoidance and mitigation measures.

 

9.49  On commencement of the development, a contribution (calculated on a per-bedroom basis) is to be paid to BFC towards the cost of measures to avoid and mitigate against the effect upon the TBH SPA, as set out in BFC's Thames Basin Heaths Special Protection Area Supplementary Planning Document (SPD) (April 2018).

 

9.50  The strategy is for relevant developments to make financial contributions towards the provision of Suitable Alternative Natural Greenspaces (SANGs) in perpetuity as an alternative recreational location to the TBH SPA and financial contributions towards Strategic Access Management and Monitoring (SAMM) measures. The Council will also make a contribution towards SANG enhancement works through Community Infrastructure Levy (CIL) payments whether or not this development is liable to CIL.

 

9.51  In this instance, the development would result in a net increase of 2 X 1-bedroom and 4 X 2-bedroom dwellings within the 400m – 5km TBH SPA buffer zone which results in a total SANG contribution of £29,578.

 

9.52  The development is required to make a contribution towards Strategic Access Management and Monitoring (SAMM) of £3,670 which is also calculated on a per bedroom basis.

 

9.53  The total SPA related financial contribution for this proposal is £33,248 payable on commencement of the development.  The applicant must agree to enter into a S106 agreement to secure this contribution and a restriction on the occupation of each dwelling until BFC has confirmed that open space enhancement works to a SANG is completed. Subject to the completion of the S106 agreement, the proposal would not lead to an adverse effect on the integrity of the SPA and would comply with South East Plan saved Policy NRM6, saved policy EN3 of the Bracknell Forest Borough Local Plan (2002), Policy CS14 of the Core Strategy Development Plan Document (2008), the Thames Basin Heaths Special Protection Area Supplementary Planning Document and the National Planning Policy Framework. 

 

vii.  Sustainability

 

9.54  Policy CS10 requires the submission of a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/person/day.

 

9.55  Core Strategy Policy CS12 advises that for development proposals for five or more net additional dwellings, or for 500 square metres (GEA) or more of floorspace for other development, any application should be accompanied by an energy demand assessment demonstrating how (potential) carbon dioxide emissions will be reduced by at least 10% and will provide at least 20% of their energy requirements from on-site renewable energy generation.

9.56  The applicants have submitted a statement to advise that Solar Pv will be used but have not included figures to support the on-site generation. A condition is therefore required to provide further details including the panels’ appearance in relation to the surrounding Listed Buildings.

 

viii. Community Infrastructure Levy (CIL)

9.57  Bracknell Forest Council commenced charging for its Community Infrastructure Levy (CIL) on 6th April 2015.

3.28 CIL applies to any new build (except outline applications and some reserved matters applications) including those that involves the creation of additional dwellings. CIL is applied as a charge on each square metre of new development. The amount payable varies depending on the location of the development within the borough and the type of development.

9.58  The application site lies within the Town Centre where a nil rate is applied.

  1. CONCLUSION

 

10.1 The proposal seeks planning permission for 6 additional flats. The site falls within the Town Centre and is acceptable in principle.

 

10.2  The design of the extensions is considered to be sympathetic to the existing building and subordinate in scale and mass. They would not harm the settings of the surrounding Listed Buildings or the amenity of the street scene and surrounding area.

 

10.3 The proposal would not result in any unacceptable detrimental impacts upon the amenities of existing and/or future occupiers.

10.4 The proposal is considered acceptable by the Local Highway Authority in terms of parking provision and safe access.

10.5 In conclusion, the proposal would be acceptable within the Town Centre location providing 6 additional units of accommodation.

10.6 Accordingly the application is recommended for approval. 

 

  1. RECOMMENDATION

 

11.1 That, following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to measures to avoid and mitigate the impact of residential development upon the Thames Basins Heath SPA, the Assistant Director: Planning be authorised to APPROVE the application subject to the following conditions amended, added to or deleted as the Assistant Director: Planning considers necessary: -

01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

    REASON:  To comply with Section 91 of the Town and Country Planning Act 1990.

 

02.  The development hereby permitted shall be carried out only in accordance with the following approved plans and other submitted details: -

23.12.2022:

Proposed North Elevation 03-E-300 P2

Proposed South Elevation 03-E-302 P2

Proposed East Elevation 01-E-301 P1

Proposed West Elevation 01-E-303 P2

Proposed Ground Floor 03-P-0G0 P2

Proposed Roof Plan 03-P-0R0 P1

Proposed Second Floor 03-P-002 P1

Proposed Third Floor 03-P-003 P2

Proposed Section 03-X-300 P1

 

17:02:2022

Proposed First Floor Plan 03-P-001 P3  

 

REASON: To ensure that the development is carried out only as approved by the Local Planning Authority.

03. The following, shall be submitted to and approved in writing by the Local Planning Authority before the relevant part of the work is begun:

Sample panel of all facing materials, including the metal cladding for the extension

Sample of all facing materials including the brick finish for the extension

The relevant part of the works shall not be carried out otherwise than in accordance with the details thus approved.

REASON : In order to safeguard the special architectural and historic interest of the nearby Listed Buildings in accordance with the requirements of policy.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

04. The dwellings hereby approved shall not be occupied until noise mitigation measures for protecting the proposed dwellings from noise from external noise sources, which shall have included a noise assessment, have been implemented in full in accordance with a scheme that has been submitted to and approved in writing by the Local Planning Authority. The noise mitigation measures shall be retained and maintained thereafter in accordance with the approved scheme.

REASON: To protect future residents from external sources of noise

Relevant Policies: BFBLP EN25

05.  No work relating to the development (including deliveries) hereby approved, including works of demolition or preparation prior to building operations, shall take place other than between the hours of 08:00 and 18:00 Monday to Friday and 08:00 to 13:00 Saturdays and at no time on Sundays or public holidays.

REASON: To protect the occupiers of the existing building and neighbouring properties from noise and disturbance outside the permitted hours during the construction period.

Relevant Policies: BFBLP EN25

06.  No works or demolition shall take place until a construction management plan showing how demolition and construction traffic, (including cranes), materials storage, staff numbers, holding areas, delivery times, facilities for operatives and vehicle parking (including existing residents parking) and manoeuvring will be accommodated during the works period, shall be submitted to and approved in writing by the Local Planning Authority. The plan shall be implemented as approved and maintained for the duration of the works.

REASON: In the interests of highway safety and the free flow of traffic.

Relevant Policies - CS DPD CS1, CS7.

07.  No part of the development shall be occupied until 10 additional covered and secure cycle parking facilities have been provided in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. These facilities shall thereafter be kept available for the parking of cycles in association with the development at all times.

REASON To ensure that the development is provided with adequate parking facilities in order to encourage the use of alternative modes of transport.

Relevant Policies: BFBLP M9, Core Strategy DPD CS23.

 

08. No part of the development shall be occupied until the refuse bin storage area and recycling facilities have been provided in accordance with the approved drawing. These facilities shall be kept available for use in association with the development at all times.

       REASON: To ensure that the development is provided with adequate facilities that allow it to be serviced in a manner which would not adversely affect the free flow of traffic and highway safety and to ensure the sustainability of the development. Relevant Policies: SEP W2, BWLP WLP6 and WLP9.

09.  No part of the development shall be occupied until a car parking allocation and management plan showing how the car parking facilities within the site will be allocated and managed has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out and maintained in accordance with the approved plan.

       REASON : To ensure that car parking is allocated fairly and to demand that would not lead to increased roadside parking which could be detrimental to the free flow of traffic and to highway safety.

       Relevant Policies: BFBLP M9, Core Strategy DPD CS23.

10.  The development shall not be begun until an Energy Demand Statement has been submitted to and approved in writing by the Local Planning Authority. This shall demonstrate that before taking account of any on -site renewable energy the proposed development will reduce carbon dioxide emissions by at least 10% against the appropriate Target Emission Rate as set out in Part L of the Building Regulations, and that a proportion of the development’s energy requirements will be provided from on-site renewable Energy productions which shall be at least 20%.The statement shall include a plan showing the location of the proposed renewable energy and elevations. The buildings thereafter constructed by the carrying out of the development shall be in accordance with the approved assessment and retained in accordance therewith.

            REASON: In the interests of sustainability and the efficient use of resources.

Relevant Policy: Core Strategy DPD CS12

11. The development shall not be begun until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of 110 litres/ person/day, has been submitted to, and agreed in writing by, the Local Planning Authority. The development shall be implemented in accordance with the Sustainability Statement, as approved, and retained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

Relevant Policy: Core Strategy DPD CS10

 

 

 

 

 

Informatives

01.  The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. 

02. The applicant is advised that the following conditions require discharging prior to commencement of development: 3, 6

       The following conditions require discharge prior to the occupation of the dwellings hereby approved: 4, 7, 8, 9

No details are required to be submitted in relation to the following conditions; however they are required to be complied with: 1, 2, 5

03.  Electric Vehicle Charging - Notwithstanding the wording of Bracknell Forest Council's Parking Standards SPD, the Building Regulations part S "Infrastructure for the charging of electric vehicles" 2021 edition takes effect on 15 June 2022 for use in England. It does not apply to work subject to a building notice, full plans applications or initial notices submitted before that date, provided the work is started on site before 15 June 2023. The applicant should familiarise themselves with, and comply with, the requirements of this document with regard to provision of electric vehicle charging infrastructure."

04.  Incidental Works Licence - Any incidental works affecting the adjoining highway shall be approved and a licence obtained before any work is carried out within the highway, through contacting The Highways and Transport Section at Time Square, Market Street, Bracknell, RG12 1JD, telephone 01344 352000 or via email at Highways.Transport@bracknell-forest.gov.uk. A formal application should be made allowing at least 12 weeks prior to when works are required to allow for processing of the application, agreement of the details and securing the appropriate agreements and licences to undertake the work. Any work carried out on the public highway without proper consent from the Highway Authority could be subject to prosecution and fines related to the extent of work carried out.

05.  No Equipment Materials on Public Highway - No builder's materials, plant or vehicles related to the implementation of the development should be parked/stored on the public highway so as to cause an obstruction at any time.

 

In the event of the S106 agreement not being completed by 29TH July 2022, the Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reasons: -

 

The occupants of the development would put extra pressure on the Thames Basin Heaths Special Protection Area and the proposal would not satisfactorily mitigate its impacts in this respect. In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Avoidance and Mitigation Supplementary Planning Document (2012), and the NPPF.